Low Headroom Minipilng is necessary to retain abutments of a listed bridge in the path of Tunnel Boring. Immediately next to Paddington…
As Crossrail tunnel boring machines pass under parts of central London Getec will be monitoring building movements. Using a novel…
At Castle Mills Island in the centre of York, Keller Geotechnique have installed Pali Radice piles to stabilise the islands quay wall and…
At the Leith end of the Edinburgh Tram project the trams cross a new bridge with embankments either side. Keller offered a Wet Soil Mixing…
A major Highways Agency project of 2008-2011 involved tunneling beneath the Devils Punchbowl in Hampshire. Keller Geotechnique's…
Some 330 homes are being built on the site of a former container depot on the outskirts of Liverpool. At Cressington Heath Keller…
Simons Construction secured a major award from Tesco to construct a large distribution centre on the outskirts of Bristol. This fastrack…
At a large Athletics Stadium in East London Keller installed over 5000 piles using three different piling systems on a very tight…
At Dinorwic Pumped Storage scheme Keller Geotechnique recently enhanced the grout curtain beneath the dam.
Jempson's the independent family run Grocers wanted to extend their business on their existing site in Peasmarsh, East Sussex. A decade…